Library Subscription: Guest
Begell Digital Portal Begell Digital Library eBooks Journals References & Proceedings Research Collections
International Journal for Uncertainty Quantification
IF: 3.259 5-Year IF: 2.547 SJR: 0.417 SNIP: 0.8 CiteScore™: 1.52

ISSN Print: 2152-5080
ISSN Online: 2152-5099

Open Access

International Journal for Uncertainty Quantification

DOI: 10.1615/Int.J.UncertaintyQuantification.2018019782
pages 23-41

COMPARISON OF RISK ANALYSIS METHODOLOGIES IN A GEOSTATISTICAL CONTEXT: MONTE CARLO WITH JOINT PROXY MODELS AND DISCRETIZED LATIN HYPERCUBE

Susana Santos
University of Campinas
Ana Teresa F. S. Gaspar
Department of Energy, School of Mechanical Engineering, University of Campinas, Brazil
Denis J. Schiozer
Department of Energy, School of Mechanical Engineering, University of Campinas, Brazil

ABSTRACT

During the development of petroleum fields, uncertainty quantification is essential to base decisions. Several methods are presented in the literature, but its choice must agree with the complexity of the case study to ensure reliable results at minimum computational costs. In this study, we compared two risk analysis methodologies applied to a complex reservoir model comprising a large set of geostatistical realizations: (1) a generation of scenarios using the discretized Latin hypercube sampling technique combined with geostatistical realizations (DLHG) and (2) a generation of scenarios using the Monte Carlo sampling technique combined with joint proxy models, entitled the joint modeling method (JMM). For a reference response, we assessed risk using the pure Monte Carlo sampling combined with flow simulation using a very high sampling number. We compared the methodologies, looking at the (1) accuracy of the results, (2) computational cost, (3) difficulty in the application, and (4) limitations of the methods. Our results showed that both methods are reliable but revealed limitations in the JMM. Due to the way the JMM captures the effect of a geostatistical uncertainty, the number of required flow simulation runs increased exponentially and became unfeasible to consider more than 10 realizations. The DLHG method showed advantages in such a context, namely, because it generated precise results from less than half of the flow simulation runs, the risk curves were computed directly from the flow simulation results (i.e., a proxy model was not needed), and incorporated hundreds of geostatistical realizations. In addition, this method is fast, straightforward, and easy to implement.


Articles with similar content:

USING PARALLEL MARKOV CHAIN MONTE CARLO TO QUANTIFY UNCERTAINTIES IN GEOTHERMAL RESERVOIR CALIBRATION
International Journal for Uncertainty Quantification, Vol.9, 2019, issue 3
M. J. O'Sullivan, G. K. Nicholls, C. Fox, Tiangang Cui
SURROGATE MODELING FOR STOCHASTIC DYNAMICAL SYSTEMS BY COMBINING NONLINEAR AUTOREGRESSIVE WITH EXOGENOUS INPUT MODELS AND POLYNOMIAL CHAOS EXPANSIONS
International Journal for Uncertainty Quantification, Vol.6, 2016, issue 4
Eleni N. Chatzi, Minas D. Spiridonakos, Chu V. Mai, Bruno Sudret
UTILIZING ADJOINT-BASED ERROR ESTIMATES FOR SURROGATE MODELS TO ACCURATELY PREDICT PROBABILITIES OF EVENTS
International Journal for Uncertainty Quantification, Vol.8, 2018, issue 2
Timothy Wildey, Troy Butler
INTERVAL-VALUED INTUITIONISTIC FUZZY POWER MACLAURIN SYMMETRIC MEAN AGGREGATION OPERATORS AND THEIR APPLICATION TO MULTIPLE ATTRIBUTE GROUP DECISION-MAKING
International Journal for Uncertainty Quantification, Vol.8, 2018, issue 3
Zhengmin Liu, Fei Teng, Peide Liu, Qian Ge
BAYESIAN INFERENCE FOR INVERSE PROBLEMS OCCURRING IN UNCERTAINTY ANALYSIS
International Journal for Uncertainty Quantification, Vol.5, 2015, issue 1
Gilles Celeux, Nicolas Bousquet, Mathieu Couplet, Shuai Fu