Suscripción a Biblioteca: Guest
Journal of Automation and Information Sciences

Publicado 12 números por año

ISSN Imprimir: 1064-2315

ISSN En Línea: 2163-9337

SJR: 0.173 SNIP: 0.588 CiteScore™:: 2

Indexed in

The Use of the GRASP Procedure for Production Scheduling and its Comparing with other Methods

Volumen 37, Edición 6, 2005, pp. 35-40
DOI: 10.1615/J Automat Inf Scien.v37.i6.40
Get accessGet access

SINOPSIS

We give formulation of the scheduling problem. Realization of the GRASP procedure for this problem is described. Modification of the neighborhood for the solvable problem, as well as the scheme of the fast estimation of solutions for this neighborhood, is considered. For the proposed algorithm the results of the computing experiment are given.

CITADO POR
  1. Witkowski Tadeusz, Antczak Pawel, Antczak Arkadiusz, Solving the Flexible Open-Job Shop Scheduling Problem with GRASP and Simulated Annealing, 2010 International Conference on Artificial Intelligence and Computational Intelligence, 2010. Crossref

  2. Witkowski T. , Antczak A. , Antczak P. , Using GRASP for optimization of flow production in FJSP problem with transportation operations, 2012 8th International Conference on Natural Computation, 2012. Crossref

  3. Witkowski Tadeusz, Antczak Pawel, Antczak Arkadiusz, Evaluation influence of routing flexibility to makespan in FJSP with SA and GRASP algorithm, 2010 Sixth International Conference on Natural Computation, 2010. Crossref

  4. Witkowski Tadeusz, Antczak Arkadiusz, Antczak Paweł, Evaluation of the Influence of Selected Production Factors on Makespan for Different Routes in FJSP Problem, in Business, Economics, Financial Sciences, and Management, 143, 2012. Crossref

Portal Digitalde Biblioteca Digital eLibros Revistas Referencias y Libros de Ponencias Colecciones Precios y Políticas de Suscripcione Begell House Contáctenos Language English 中文 Русский Português German French Spain